| Sign In | Join Free | My insurersguide.com |
|
| Categories | Cantilever Racking |
|---|---|
| Brand Name: | Shitong |
| Model Number: | Cantilever Rack |
| Certification: | CE, TUV, ISO9001, IS014001 |
| Place of Origin: | China |
| MOQ: | 1000kg |
| Price: | $0.6-$1/kg |
| Payment Terms: | T/T,L/C |
| Supply Ability: | 150tons/day |
| Delivery Time: | 1-3 weeks |
| Packaging Details: | All goods packed with plastic wrap and fix with steel tape. |
| Scale: | Medium Duty |
| Color Of Beams: | Blue, Gray, Orange, Yellow |
| Installation: | Boltless assembly for quick and easy installation |
| Application: | Suitable for long materials |
| Company Info. |
| Nanjing Shitong Racking Co., Ltd. |
| Verified Supplier |
| View Contact Details |
| Product List |
Introduction
Shitong multi-level cantilever racks take vertical storage to the
next level. By stacking multiple levels of arms, warehouses can
multiply capacity within the same footprint.


Key Features
Multi-tier structure with reinforced uprights and cross bracing.
Safe access through staircases, walkways, or platforms.
Heights up to 10m available with strong load capacity.
Optional decking for small goods or pallets.
Designed for both manual and mechanical handling.

Applications
High-ceiling warehouses, building material storage, industrial
distribution centers.
Advantages
Maximizes cubic space without expanding floor area.
Allows categorized storage across multiple levels.
Safe, efficient, and scalable system.


FAQ:
1. >How can you get a quote as quickly as possible?
For racks with specific dimensions, please tell us:
>1) >the rack dimensions you require. Height×Depth×Length?
>2) >the maximum load requirement for each layer.
>3) >how many layers for one independent rack consists of?
>4) >The specific quantity of racks you need.
For warehouses that need to provide rack drawings, please tell us:
>1) >Your pallet size, and which dimension of the pallet is for the forklift's entry direction?
>2) >The maximum height and maximum load requirements for one pallet plus cargo.
>3) >Provide your warehouse drawing.
>2. >What’s your payment terms?
TT or L/C at sight
>3. >What is your packaging method?
All goods packed with plastic wrap and fix with steel tape. Ensure all goods can be moved by forklift.
Project Cases:


|