Sign In | Join Free | My insurersguide.com
insurersguide.com
Products
Search by Category
Home > Refrigeration & Heat Exchange Parts >

Modern Prefabricated Steel Structure Building For Warehouse Workshop Office House Carport

Categories Steel Structure Building
Brand Name: TSIN
Model Number: TSIN
Certification: ISO, CE, SGS
Place of Origin: Shandong, China
Place Of Origin: Qingdao, Shandong, China
MOQ: 1000 sqm
Price: USD 40-60 / sqm
Payment Terms: T/T,L/C
Supply Ability: 100,000 sqm / month
Delivery Time: 6 weeks after shop drawing get approval
Packaging Details: Packed on steel pallet with fixture and loaded into 40'HQ/OT
Warranty: 5 Years
Maintenance Costs: Reduced
Labor Costs: Lower
Connection: Bolts
Insulation: EPS, Glasswool, Rockwool, PU On Option
Thickness Of Panel: 50mm, 75mm, 100mm, 150mm, 200mm, 250mm
Using Life: 50 Years
Product: Steel Structure
Material Grade: Q355B, Q235B
Structure type: Portal frame
Design Load: Wind, Snow, Seismic
Design software: PKPM, Tekla structures, CAD
Sand blasting: Sa 2.5
Surface treatment: Anti-corrosive paint or hot dipped galvanized
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
Submit Buying Request
  • Product Details
  • Company Profile

Modern Prefabricated Steel Structure Building For Warehouse Workshop Office House Carport

Modern Prefabricated Steel Structure Building for Warehouse Workshop Office House Carport Bedroom Bathroom Living Room School
Product Description
Modern Prefabricated Steel Building
The Modern Prefabricated Steel Building is designed for easy assembly and recyclability, making it an excellent choice for industrial warehouses, offices, and residential use. Constructed from high-quality steel, it features a robust load-bearing main frame made up of beams and columns.
Structural Components
This building includes a comprehensive bracing system to ensure stability and durability:
  • Tie bars
  • Knee bracing
  • Stay bars
  • Column bracing
  • Horizontal bracing
These components work in conjunction with precision-engineered roof, wall, and floor systems to create a reliable metal structure.
Advantages Over Traditional Concrete Buildings
  • Superior Strength : Utilizes steel plates or sectional steel for enhanced structural integrity and improved seismic resistance.
  • Faster Construction : Prefabricated components allow for quick on-site assembly, significantly reducing construction time.
  • Sustainability : Steel is both reusable and recyclable, minimizing construction waste and supporting environmental protection.
This modern steel building offers a versatile, efficient, and eco-friendly solution, perfectly balancing strength, speed, and sustainability for a wide range of applications.
Prefabricated steel structure Steel structure warehouse Steel building construction
PRODUCT SPECIFICATIONS
ProductsSteel Structure Warehouse
Frame typePortal frame, multi-story frame
Main frameHot-rolled or Welded H beam and column, Q355B steel
Bracing componentsTie bar, staying bar, Horizontal bracing, Column bracing
Cladding systemSandwich panel with glass wool, rock wool,PU insulation,Corrug ated color steel sheet
AccessoryRidge tile, trim, Gutter, Down pipe,skylight, clerestory
DoorRoll up door, industrial section door, swing door, Sliding door
WindowPVC window, aluminum window, metal louver
Steel structure warehouse Steel structure construction
Our Advantages
Benefits of Steel Structure Buildings
Easy Assembly
Prefabricated steel components are installed on-site precisely following detailed drawings. The assembly process includes erecting steel columns with cross-bracing, installing roof beams with horizontal bracing, and fitting purlins and enclosure panels, ensuring a smooth and efficient construction flow.
Cost Efficiency
The lightweight properties of steel reduce foundation costs significantly. Coupled with a faster construction schedule, projects can be completed sooner, resulting in earlier operation and better overall economic returns compared to traditional concrete buildings.
Streamlined Construction with Short Timelines
Factory-manufactured parts arrive ready for quick assembly on-site, dramatically shortening the build time. Typically, a steel structure can be completed within just a few weeks.
Energy Efficiency & Environmental Friendliness
Corrugated color steel sheets and insulated sandwich panels offer excellent thermal performance, contributing to energy savings. Dry construction methods reduce dust and pollution, while the recyclable nature of steel further supports sustainable building practices.

Differences Compared to Concrete Buildings
Faster Construction Period
Prefabricated steel components require minimal on-site welding, enabling significantly faster erection than traditional concrete structures.
Improved Environmental Impact
Steel assembly uses no water and generates less dust and pollution, creating a cleaner construction environment.
Better Cost Performance
Accelerated construction reduces labor expenses, with total costs typically 20-30% lower than conventional concrete buildings. Additionally, steel provides superior durability and longevity.
Lighter Structural Load
The use of lightweight metal walls and roofs substantially decreases the overall building weight, which reduces foundation load compared to brick or concrete alternatives.
Quality inspection process Quality certification
FAQ
1. What materials are used in your steel structure buildings?
Our steel structure buildings primarily utilize high-quality H-section steel, I-section steel, color steel plates, and sandwich panels, all known for their reliability and durability.
2. What certifications do your steel structure buildings have?
Our products are certified under the ISO 9001 quality management system and CE certification, ensuring compliance with international standards. They can also be customized to meet specific market requirements.
3. How long is the construction period for a steel structure building?
The construction period varies based on size and complexity. Typically, a 4,000 square meter building can be completed in approximately 40 days, thanks to the use of prefabricated components.
4. Can steel structure buildings be customized to meet specific needs?
Yes, we offer customization for the design, size, and configuration of steel structure buildings, tailored to the specific usage scenarios and functional requirements of our customers.
5. Do you provide installation guidance for steel structure buildings?
We supply detailed installation drawings and instructions. For larger projects, we can also dispatch professional engineers to the site to ensure smooth installation and address any challenges that may arise.
Quality Modern Prefabricated Steel Structure Building For Warehouse Workshop Office House Carport wholesale
Send your message to this supplier
 
*From:
*To: Qingdao Tsin Steel Structure Construction Technology Co.,Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0