| Sign In | Join Free | My insurersguide.com |
|
| Categories | Selective Pallet Racking |
|---|---|
| Brand Name: | Shitong Racking |
| Model Number: | Selective Pallet Racking |
| Certification: | CE, TUV, ISO9001, IS014001, |
| Place of Origin: | China |
| MOQ: | 1000KG |
| Price: | $0.6-$1/kg |
| Payment Terms: | L/C,T/T |
| Supply Ability: | 150tons/day |
| Delivery Time: | 1-3 weeks |
| Packaging Details: | All goods packed with plastic wrap and fix with steel tape. |
| Type: | Pallet Rack, Multi-Level |
| Use: | Warehouse Rack, Industrial, Heavy Duty, storage equipment |
| Weight capacity: | 800kg-4000kg/level |
| Color: | orange, grey, blue, RAL System, Customized as required |
| Surface treatment: | Powder Coating, Galvanized |
| Hs Code: | 730890 |
| Brand: | Shitong Racking |
| Free Design: | Yes |
| Loading Port: | Nanjing, Shanghai, or others |
| Company Info. |
| Nanjing Shitong Racking Co., Ltd. |
| Verified Supplier |
| View Contact Details |
| Product List |
Selective pallet racks are used for storing and handling palletized goods. They allow for multi-level pallet storage and provide efficient storage and convenient retrieval within the warehouse.
Standard pallet racking is 2700mm long, allowing for the storage of 2 standard-sized pallets (1200x1000 mm) or 3 European standard pallets (800x1200 mm) per level. With the aid of forklifts, pallets can be placed at heights. Pallet support bars, mesh mesh decking, or steel panels enhance the safety of pallet handling and placement on the racking.

Product Name | Selective pallet rack, heavy duty rack, back to back rack | Certificate | ISO 9001, ISO 14001, ISO 45001, CE, TUV |
Brand | Shitong | Surface | Galvanized/Powder Coating |
Usage | Warehouse/industrial storage | Free Warehouse Desgin | Yes |
Material | Q235B, Q355B steel | Beam load capacity | ≤ 4000kg/layer |
Color | RAL system, such as RAL5005, RAL5015, RAL2004 | Rack size | Customizable |
Place of Origin | China | HS code | 73089000 |
1. Can you design a racking layout for my warehouse for free?
Sure, and that's part of our service.
2. What are the port of loading options?
Nanjing, Shanghai, or other ports?
3. What’s your payment terms?
TT or L/C at sight
4. What is your delivery time?
Production is usually completed approximately 3 weeks after receiving deposit.
Project Cases:


Production Line

|