| Sign In | Join Free | My insurersguide.com |
|
| Categories | Pneumatic Borewell Machine |
|---|---|
| Brand Name: | Shitan |
| Model Number: | ST-200 |
| Place of Origin: | Jinzhou,China |
| Product Name: | ST 200 Pneumatic Drilling Rig |
| Key words: | Water well drilling rig, drilling rig, pneumatic water well drilling rig |
| Drilling Hole Diameter: | 105-300 Mm |
| Drilling Depth: | 100-200 Meters |
| Drilling Rod Diameter: | 76 Mm |
| Drilling Rod Length: | 3 M |
| Lifting Force: | 18MT |
| Material: | Rubber Track |
| Overall Dimensions: | 3.8m*1.8m*2.3m |
| Walking speed: | 2.5km/h |
| High leg travel: | 1.35m |
| Engine: | Xidong:65KW |
| Company Info. |
| Jinzhou City Shitan Machinery Equipment CO. LTD. |
| Verified Supplier |
| View Contact Details |
| Product List |
Rubber tracked pneumatic drilling rig is a drilling equipment powered by compressed air and using rubber tracks for walking. Its core advantage is the ability to be flexible and adaptable to complex terrain.
| Parameter | Value |
|---|---|
| Product Type | Crawler Mounted Drilling Rig |
| Drilling Hole Diameter | 105-300 mm |
| Drilling Rod Length | 3 m |
| Weight | 5.5 MT |
| Rotary Torque | 5900 |
| Material | Rubber Track |
| Walking speed | 2.5km/h |
| Lifting Force | 18T |
| Maximum Rotational Speed | 30/120r/min |
| Overall Dimensions | 3.8m*1.8m*2.3m |
| Engine | Xidong:65KW |
Mining field: Drilling blasting holes in open-pit mines or
underground mines to prepare for ore mining.
Infrastructure project: Construction of geological exploration
holes and anchor holes for slope protection before tunnel
excavation.
Quarry operation: drilling pre split holes or blasting holes before
mining in the quarry.
All maintenance operations must be carried out after shutting down
the machine and cutting off the air supply (shutting down the air
compressor, releasing the air duct pressure). It is strictly
prohibited to disassemble components under pressure to prevent
safety accidents;
When replacing components, it is necessary to use original parts
that match the drilling rig model (such as pneumatic motor blades,
impactor pistons) to avoid equipment failure caused by non original
parts;
Establish a maintenance ledger to record the maintenance time,
component replacement status, and operation duration for each
maintenance, in order to trace the equipment status and prevent
malfunctions in advance.



|