GS6000-TS horizontal directional drilling machine, 600ton horizontal directional drilling machine, 600ton hdd machine, 600ton hdd rig, goodeng hdd machine 600ton, goodeng hdd rig 600ton,

  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
Submit Buying Request
  • Product Details
  • Company Profile

GS6000-TS horizontal directional drilling machine, 600ton horizontal directional drilling machine, 600ton hdd machine, 600ton hdd rig, goodeng hdd machine 600ton, goodeng hdd rig 600ton,

GS6000-TS horizontal directional drilling machine, 600ton horizontal directional drilling machine, 600ton hdd machine, 600ton hdd rig, goodeng hdd machine 600ton, goodeng hdd rig 600ton,

I. Project Profile

Project Name:China Petroleum and Chemical Corporation & Kuwait National Oil Company Limited Joint Project ---Zhanjiang, Lianjiang Product Oil Pipeline Project Sea Area HDD Works
The Owner/Construction Party:China Petrochemical Marketing Co. Ltd -Huanan branch
Construction Organization:Sinopec Shengli Oil Construction Engineering Co. LTD
Project Characteristics:More than 4 km HDD Works. The longest Land -Sea HDD Project in China
Geological Conditions:Plain Fill, Sludge, Silty Clay, Weathered Basalt

Topographic Condition:The HDD entry point of Tongming Strait is in a village,Tongming Strait exit point is in a farmland beside the seawall.


Construction difficulties:

1. Distance: 4071 meters HDD Project (370 steel pipes welded together);

2. Complex geologic structure, High Demand of Mud Matching;

3. Prefabricated curve should meet the demand of radius of curvature

II. Construction Equipment


Two sets of GS6000-T, Two sets of GS5000-L, One set of GT5000 Ejector Sleeve, Six sets of CN2500 Mud Pump, Two sets of American ParaTrack2 Location system.
III. Technical Support

Risk Prevention:Construction site is equipped with 1 set of GT5000 Ejector Sleeve; When reaming back, it adopts turning rolls and pipe ditch to send pipeline, protecting all turning points.
Reaming(second time):Using 500mm, 800mm Fluted Reamer
Pulling pipeline:Using Barrel Reamer

IV. Construction Time
Start Time:March 15th, 2019
Finish Time: May 17th, 2019

V. Auxiliary Mud
Mud Specifications:Marsh Funnel Viscosity 80S-100S.


VI. Construction Conclusion

It is the first time for us to finish such a long-distance project in China, it is a valuable experience for future construction project.





Quality GS6000-TS horizontal directional drilling machine, 600ton horizontal directional drilling machine, 600ton hdd machine, 600ton hdd rig, goodeng hdd machine 600ton, goodeng hdd rig 600ton, wholesale
Send your message to this supplier
 
*From:
*To: SHANGHAI COLOURFUL INDUSTRY CO.,LTD
*Subject:
*Message:
Characters Remaining: (0/3000)
 
You May Like
    Inquiry Cart 0