Sign In | Join Free | My insurersguide.com
insurersguide.com
Products
Search by Category
Home > Used Machinery & Equipment >

Melt Patch Asphalt Driveway Patch Leveling Bridge Deck Approaches

Categories Asphalt Patch Material
Brand Name: Wage
Model Number: HG TP
Certification: EMS, OHSMS
Place of Origin: China
MOQ: 1 ton
Price: FOB 1800- 1900 USD per ton
Payment Terms: L/C, T/T, Western Union, MoneyGram
Supply Ability: 20 tons per week
Delivery Time: 1- 3 weeks
Packaging Details: White PE bag,N.W.10kg/bag. 1000kg/pallet.
Main: modified asphalt
Color: black
Type: thermoplatic
Apperarance: Granules
Operation Melt temperature: 280°C
Curing Time: 5-8 minutes
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
Submit Buying Request
  • Product Details
  • Company Profile

Melt Patch Asphalt Driveway Patch Leveling Bridge Deck Approaches

Thermoplastic asphalt road patching material for road crack


Thermoplastic asphalt road patching material


General Description

This material is an elastic repair material, composed of modified asphalt, chalk powder, polymer materials, quartz sand, rubber powder, and other materials mixed with special additives.

Special for hot-applied, aggregate-flled, polymer-modifed asphalt pavement repair mastic, used for repairing distresses in asphalt .


Product Specifications

ItemRange
ApperaranceGranules
ColorBlack
Operation Melt temperature280°C
Curing Time5-8 minutes

Application:

* Filling wide cracks and joints

* Filling potholes

* Road reticular crack repairing

* Pretreatment of fatigue cracked are prior to surface maintenance

* Repairing and Leveling manhole covers

* Leveling bridge deck approaches

* Repairing deteriorated longitudinal joints such as tramcar

* Filling spalls, popouts,and breaks, etc

Packaging

White PE bag,N.W.10kg/bag.

1000kg/pallet. 1.2*1.0*1.0M size for pallet


Storage

The product can be stably stored for at least one year when kept in a dry place at temperature below 30°C.Avoid exposure to direct sunlight.


Using step

1.Clean the moisture and dust in the area to ensure they are dry and clean

2.Use a thermoplastic boiler to heat the elastic asphalt patching material to 280 ℃

3.Choose different widths of coating scoop based on the size of crack or other damage


Caution

When the material is melt will keep a high tempreture on itself and machine or tools, pls mind the scald


Contact

Rita QU

Xi'an Wage Traffic Infrastructure Installation Co.,LTD
Mail: wagetraffic@hotmail.com Cell/ Whatsapp: +86 15591818803
Add:Room 401, Unit 2, Bilding 2, Shenglong Plaza, Weiyang Road, Xi'an, 710016, Shaanxi, China
Quality Melt Patch Asphalt Driveway Patch Leveling Bridge Deck Approaches wholesale
Send your message to this supplier
 
*From:
*To: Xian WAGE Traffic Infrastructure Installation Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0