| Sign In | Join Free | My insurersguide.com | 
              
  | 
      
| Categories | Boiler Steam Header | 
|---|---|
| Brand Name: | SAT-CHAM | 
| Model Number: | Boiler header | 
| Certification: | ISO CE | 
| Place of Origin: | China | 
| MOQ: | 1 Set | 
| Price: | Negotiable | 
| Payment Terms: | L/C, T/T, Western Union | 
| Supply Ability: | 500 Tons / Month | 
| Delivery Time: | 30 Days | 
| Packaging Details: | Seaworthy packing | 
| Usage: | Industrial | 
| Structure: | Water Tube | 
| Pressure: | High Pressure | 
| Style: | Horizontal | 
| Fuel: | Coal-fired | 
| Output: | HOT WATER | 
| Company Info. | 
| Jiangsu Sat-Cham Energy Technology Co., Ltd. | 
| Verified Supplier | 
| View Contact Details | 
| Product List | 
Diameter(OD)  | ¢76mm~¢914mm  | 
Length(Max)  | 23000mm  | 
Temperature(℃)  | 300~1500  | 
Brand  | SAT-CHAM | 
Application:
air cooler, fired heater, heat exchanger, marine boiler,
economizer, power plant boiler, HRSG boiler, waste heat recovery
unit, air heater etc
Characteristic:1.Anti-corrosion2.Anti-wear3.Lower contact
resistance 4.Higher Stability
Our products can be modified according to our customers' needs and
the situation.we design and manufacture safe,reliable and efficient
H-fin tubes.it has also completed stand-alone product quality
assurance systems.Production of H-fin tubes are with high heat
transfer efficiency, they have flue gas resistance and are designed
for a small space.
| Technical parameters | The high degree of fin 0-16mm(or outside diameter of fin φ25-φ75); Pitch of fins 2.0-5.0mm; Length of finning tube 0.5~ 14m.  | 
| Single metal rolling finning tube | Pure aluminum 1060 or aluminum alloy 6063,6061. Outside diameter Shall be less than 40mm  | 
| Double metal rolling finning tube | Tube-based protection from the outer layer of aluminum tubes,corrosion-resistant,Tube-based can be made of carbon steel pipe,in addition to,stainless steel tube and copper tube can also be used, as well as titanium alloy tube  | 
| Package | The aluminum finned tubes are well packed in plastic film in the
inner and steel fram in the outer  | 
Q1: How long is the warranty period?
We provide 18 months warranty for all spare parts(exclude fragile
parts).
Q2: How can we guarantee quality?
1 All machines are in strict accordance with the ISO quality and CE
system requirements.
2 Each procedure is crafted by professional Skilled labour,
followed by particular QC
3 All information of our products can be checked in efficient
management system.
Q3: What can you buy from us?
Boiler Economizer, Boiler Fin tube, Boiler Air preheater, Boiler
superheater, Boiler membrane wall,
Boiler manifold headers and other pressure spare parts.
Q4: What kind of service do you provide?
Before sales:
Provide productinformations, market research forecasting, product
customization,product processing,consultation and other services
for your convenience.
Q5: Are you a factory or trading company, where are you located?
We are a factory, just 130km(2 hours by car) away from Shanghai
Airport.
We offer pickup service at Shanghai for your visit.



                                 
                             |