| Sign In | Join Free | My insurersguide.com |
|
| Categories | Double Layer Roll Forming Machine |
|---|---|
| Brand Name: | FMS |
| Model Number: | Double Layer |
| Certification: | ISO CE |
| Place of Origin: | CHINA MAINLAND |
| MOQ: | 1 Set |
| Price: | Negotiable |
| Payment Terms: | L/C, T/T, D/A, D/P |
| Supply Ability: | 20 Sets Per Month |
| Delivery Time: | 30 Working Days |
| Packaging Details: | 20' FLC |
| Product Name: | Roofing Sheet Wall Panel Double Layer Roll Forming Machine IBR Roll Forming Machine |
| Dimension(L*W*H): | 7.5*1.3*1.3 m |
| Raw Material: | Galvalume, Galvanized |
| Working Speed: | 8-15 m/min |
| Rolling thinckness: | 0.3-0.8mm |
| Shaft material: | 45# steel |
| Motor power: | 7.5 kw |
| Pow supply: | 380V, 60Hz, 3Ph |
| Profile: | as customer requested |
| Company Info. |
| Cangzhou Famous International Trading Co., Ltd |
| Verified Supplier |
| View Contact Details |
| Product List |
Roofing Sheet Wall Panel Double Layer Roll Forming Machine IBR Roll Forming Machine
Specification
| Model | 840/900 |
| Rod | 18 |
| Production and processing speed | 10 m/min |
| Processing thickness | color steel 0.8mm |
| Axle diameter of roll | Ø70 |
| Frame | 300H steel welding |
| Medium plate | 16mm |
| Transmission mode | 1 inch sprocket chain drive |
| Shaft material | 45# quenching and finishing machining |
| Wheel material | 45# finishing car processing, high frequency quenching, hard chrome plating |
| Main engine power | 4KW pure copper motor |
| Oil pump motor | 4KW |
| Control system | touch screen setting |
| Shear | hydraulic mold shear |
| Cutter plate | Cr12 blade |
Advantage
The metal system is accurate and solid, and will not move over time
or with changes in temperature.
There is a wide range of stud widths from 50mm to 146mm to meet
varying requirements.
It is a fast and clean system to erect that allows services to pass
through easily.
All sections fit together easily and door frames are formed very
simply.
Payment terms
30% in advance as down payment
70% is paid before the shipment is processed
Delivery
FOB: Tianjin Xingang Port
The Delivery Time: 30 days after the down payment is received.

|