| Sign In | Join Free | My insurersguide.com |
|
| Categories | Roof Roll Forming Machine |
|---|---|
| Brand Name: | FMS |
| Certification: | ISO CE |
| Place of Origin: | CHINA MAINLAND |
| MOQ: | 1 Set |
| Price: | Negotiable |
| Payment Terms: | L/C, T/T, D/A, D/P |
| Supply Ability: | 20 Sets Per Month |
| Delivery Time: | 30 Working Days |
| Packaging Details: | 40' FLC |
| Product Name: | 840 Trapezoidal Roof Panel Roll Forming Machine IBR |
| Raw Material: | Galvalume, Galvanized, PPGI, Aluminum |
| Control systePLCm: | PLC |
| Rolling thinckness:: | 0.3-0.8mm |
| Voltage: | 380V 50HZ 3P or Customize as customer' request |
| Warranty of core components: | 1 Year |
| Color: | As per customer reqeust |
| Power: | 4KW |
| Feeding width: | 1220mm |
| Roller material: | 45# steel with 0.05mm chrome |
| Company Info. |
| Cangzhou Famous International Trading Co., Ltd |
| Verified Supplier |
| View Contact Details |
| Product List |
840 Trapezoidal Roof Panel Roll Forming Machine IBR
Specification
| No. | Item | Description |
| 1 | Coil | Galvalume, Galvanized, PPGI, Aluminum |
| 2 | Rolling thickness | 0.3-0.8mm |
| 3 | Working Speed | 8-20m/min ( not including the cutting time) |
| 4 | Roller Station | 12 Raws |
| 5 | Dimension (L*W*H) | About 6*1.5*1.3 m |
| 6 | Machine Weight | 4000 KG |
| 7 | Electrical Control System | Delta PLC (can be customized) |
| 8 | Drive Motor Power | 4KW |
| 9 | Hydraulic Station Power | 4KW |
| 10 | Power Supply | 380V, 60HZ, 3 PHASES(can be customized) |
| 11 | Cutting Accuracy | ±2 mm |
| 12 | Driving Mode | Single Chain 1 inch |
| 13 | Material of Shaft | 70 mm 45#steel forged |
| 14 | Material of Roller | 45# Steel Finish Machining, Plated Hard |
Guarantee
1. Guaranteed against malfunctions due to manufacturing defects for1 years after date of purchase except Electrical parts.
2. Repairs will not be performed even during the guarantee period in the follow circumstances
- Damage occurs due to a natural disaster
- Malfunction occurs due to user error
- Malfunction occurs due to modifications
- Malfunction occurs due to further movement or shipment after installation
Payment terms
40% in advance as down payment
60% is paid before the shipment is processed
Delivery
FOB: Tianjin Xingang Port
The Delivery Time: 30 days after the down payment is received

|