| Sign In | Join Free | My insurersguide.com | 
 | 
| Categories | Guided Boring Machine | 
|---|---|
| Brand Name: | KonDaSin | 
| Model Number: | GBM-600 | 
| Certification: | ISO9001 | 
| Place of Origin: | china | 
| MOQ: | 1 | 
| Price: | USD250000unit | 
| Supply Ability: | 5units per month | 
| Delivery Time: | 30 days | 
| Packaging Details: | 40" GP | 
| Name: | Horizontal drilling machine | 
| Maximum Torque: | 28000 Nm | 
| Maximum pressure: | 31.5 bar | 
| Drilling Diameter: | 800mm | 
| Sliding base stroke: | 560mm | 
| Application: | Underground crossing drilling | 
| Company Info. | 
| Kondasin International Co.,Ltd. | 
| View Contact Details | 
| Product List | 
Jacking Pipe Machine Guided Boring Machine Underground Machine Simple Operation

Hydraulic jacking machine, designed for large pipe jacking engineering , generally used in the construction of cement pipe crossings, building houses translation, sewers, roads and rivers as a sheathing of other projects across a variety of channels. It is especially fit for non-excavation of casing steel pipes or semi-tubular pipes for sewage pipes, rain and sewage diverting pipes and heat pipes.
Horizontal auger machine is designed for steel pipes less than 600mm diameter.
The construction efficiency is high, the precision is high, the operation is simple,the performance is reliable, and the construction quality meets the design requirements.
The design of lightweight compact disassembled structure make occupation smaller so it is suitable in narrow areas of urban roadways.

| GBM600 host | |
| Maximum torque | 28000 Nm | 
| Maximum pressure | 31.5 bar | 
| Maximum speed | 38 rpm | 
| Maximum thrust | 1250kN | 
| Sliding base stroke | 560mm | 
| Forward forward | 200mm | 
| Equipment weight | 4000Kg | 
| Center height | 750mm | 
| Drilling diameter | 800 mm | 
| Length | 3800mm | 
| Width | 1700mm | 
| GBM hydraulic pumping station | |
| Motor power | 75kW | 
| Maximum pressure | 250 bar | 
| Fuel tank capacity | 300L | 
| Pump station weight | 2000 kg | 
| length | 2100 mm | 
| Width | 1100 mm | 
| Height | 1550 mm | 
Three construction steps of GBM
Step 1: laser guided drilling

Step 2: auger drilling and unloading slag

Step 3: Replace the cement pipe


1. Engine energy saving and environmental protection, strong power.
2. Operation is simple, performance is reliable, the whole process maintains the horizontal straightness ± 50mm,greatly improving the construction efficiency.
3. The foundation pit equipment submitted small, light weight, large thrust.
4. Machine head can be selected according to different layers to achieve optimal construction performance.

They are used in the construction of cement pipe crossings, building houses translation, sewers, roads and rivers as a sheathing of other projects across a variety of channels.Suitable for geological construction of sand, silt, hard soil and clay.

|   | 
 Auger Guided Boring Machine HDD Micro Jack Drill For Urban Roadways
                                                                                    
                        
                        
                        
                                                            Auger Guided Boring Machine HDD Micro Jack Drill For Urban Roadways
                                                    
                        
                     High Precision Guided Boring Machine , Underground Boring Equipment 600mm Drill Dia
                                                                                    
                        
                        
                        
                                                            High Precision Guided Boring Machine , Underground Boring Equipment 600mm Drill Dia
                                                    
                        
                     Foundation Pit Microtunnel Boring Machine Energy Saving Environmental Protection
                                                                                    
                        
                        
                        
                                                            Foundation Pit Microtunnel Boring Machine Energy Saving Environmental Protection
                                                    
                        
                     Pipe Jacking Tunneling Guided Boring Machine Hydraulic System PLC Control
                                                                                    
                        
                        
                        
                                                            Pipe Jacking Tunneling Guided Boring Machine Hydraulic System PLC Control
                                                    
                        
                     Underground Boring Machine , Horizontal Auger Boring Machine Sewage Pipes
                                                                                    
                        
                        
                        
                                                            Underground Boring Machine , Horizontal Auger Boring Machine Sewage Pipes
                                                    
                        
                     Horizontal Directional  Guided Boring Machine Small Type Full Hydraulic
                                                                                    
                        
                        
                        
                                                            Horizontal Directional  Guided Boring Machine Small Type Full Hydraulic