| Sign In | Join Free | My insurersguide.com |
|
| Categories | Bridge Formwork Systems |
|---|---|
| Brand Name: | ZNLS |
| Model Number: | BR |
| Place of Origin: | China |
| MOQ: | 25 tons |
| Price: | Negotiation |
| Payment Terms: | 30%TT, Balance against copy of BL |
| Supply Ability: | 400 to 500 tons per month |
| Delivery Time: | 14 to 21 days after deposit |
| Packaging Details: | In bundle or pallets, or by customer demands |
| Raw Material: | Steel, Timber Beam And Plywood |
| Supporing system: | Stair tower and scaffolding |
| Shape and size: | Project specific design |
| Adjustability: | Wide range height adjustment |
| Assembly type: | Standard bolts and pins |
| Application: | Bridge super structure concrete construction |
| Company Info. |
| ZNLS ENGINEERING CO., LTD. |
| View Contact Details |
| Product List |
Cantilever bridge deck formwork - Flexible bridge formwork for different corss-sections
Overview
Cantilever bridge deck formwork is a standardized system formwork with high repeat use rates in bridge construciton. By project-specific design, customized bridge formwork solution will suit the construciton needs perfectly.
Characteristics
1 . Versatile : The similar structure with flexible wall form makes it be adapted to any bridge geometries, both to steel-composite and pre-cast concrete bridge component.
2 . Modular and systematic : The assembly method is universal with other ZNLS systems; The connection parts and type are standard with high utilizaiton rates.
3 . High load bearing : ZNLS shoring system can transfer high loads from the bridge superstructure.
Value-added Service
ZNLS will provide relating technical service including formwork & scaffolding proposal drawing, material list, shop drawing, calculation sheet, loading capacity analysis and assembly instruction on site and other after-sale service. Moreover, cargo transport arrangement and tracking, relating import and export documents will be supplied as customs’ requirements.

|