| Sign In | Join Free | My insurersguide.com |
|
| Categories | Guardrail Roll Forming Machine |
|---|---|
| Brand Name: | Sussman |
| Model Number: | RF |
| Certification: | CE ISO9901 |
| Place of Origin: | China |
| MOQ: | 1 set |
| Price: | negotiable |
| Payment Terms: | L/C, T/T |
| Supply Ability: | 10 set per month |
| Delivery Time: | 40-60 |
| Packaging Details: | steel |
| Voltage: | 380V |
| Material Weight: | 5T |
| Working Hour: | 6-8 hours |
| Transmission: | Gear box or chain driving |
| Warranty: | 1 year |
| Tile Type: | Colored Glaze Steel |
| Company Info. |
| Sussman Machinery(Wuxi) Co.,Ltd |
| Verified Supplier |
| View Contact Details |
| Product List |
Product specifications
| Productivity | Products as per your drawings |
| thickness | 1.5-3.0mm |
| coil material | Galvanized Coil |
| coil weight | 5000kg |
| coil width | 500mm |
General specification of production line
| Total power required | 30 k.w |
| Dimensions(L*W*H) | 9m*2.5m*1.6m |
| Overall packing shipment | one 40ft container |
| Working hours per day | 8 to 16 hours |
| Set up time | 20 min |
| Line direction | Left to right while facing operator panel |
| Machine frame | H-BEAM frame |
| Variable line speed | 15mtr./min.(not including cut) |
| Material loading system | Manual |
| Accuracy level | Profile dimension +/- 0.5 mm |
Consist of production line
| A: Passive Decoiler |
| B: Feeding & Leveling Applicator |
| C: Punch Machine |
| D: Roll Forming Unit |
| E: Cutting System |
| F: Output Table |

Profile drawing and samples
Our advantage,
1.We can produce the cold roll forming machine according to
customers final products and requirements.
2.We are focusing on the reputation.The after-sales service can be
assured.Engineer are available to service machinery overseas.
After-sale Serive
-The seller take responsibility to installation and commissioning
of the equipment and free training. After machine arrive the
destination, by the request of the buyer , the seller will provide
1 technical engineer to guide installation and training , and the
buyer should give the technical person with full cooperated.
-Installation period: about 5 days after the complete preparation
by the buyer such as the foundation and all necessary accessories.
-Training time: 5 days.
-Before departure of the engineers from seller, the buyer should
pay for installation and commissioning fee 100$/day to the point
account of the seller. The two-way ticket,visa, food, hotel , the
translator and insurance are all should provide by buyer with full
responsibility.
-The seller supply technical data (including forming mould drawing,
electrical elements drawing and equipment drawing etc.)
|