| Sign In | Join Free | My insurersguide.com |
|
| Categories | Bailey Bridge |
|---|---|
| Place of Origin: | China |
| Brand Name: | Great Wall |
| Certification: | ISO,CE,SGS |
| Sand Blasting: | SA2.5 |
| Main Steel: | GB Q345B |
| Secondary Steel: | GB Q235 |
| Bolts Grade: | 8.8 |
| Pins Material: | 30CrMnTi |
| Corrosion Prevention: | Galvanization Or Painting |
| Load: | HS20,HS25,HL93,HA,HA+HB,Truck-20,50,Trailer-60,80 |
| MOQ: | 1 set |
| Price: | Negotiated |
| Packaging Details: | Containers(20GP,40HC) Or In Bulks |
| Delivery Time: | Depending on the quantity |
| Payment Terms: | TT LC |
| Supply Ability: | 10,000TON each year |
| Model Number: | CB321 and CB200 |
| Grade: | JT-T 728-2008 |
| Type: | Heavy |
| Application: | Steel Structure Bridge |
| Standard: | BS|DIN|GB |
Bailey Bridges which are portable steel bridge have been widely used in various fields, its most important feature is to achieve a variety of spans, bear carrying capacity, light and handy components, easy to dismantle and strong adaptability can be quickly completed with simple tools and manpower.
Specifications:
Single lane: | Standard roadway: 3.15m / 4.2m Or specially made narrow or wider | Single lane: 30ft-200ft |
Double lane: | Standard roadway:7.35m Or specially made narrow or wider | Double lane:30ft-180ft |
Load: design according to different requirements(Hs20,HS25,BS5400 HA,Truck,Trailer,30TON,40TON,50TON,etc) | Deck: steel deck/timber deck | |
Bridge type: CB100, CB200,Decking,Overhung Type Or other special-made design according to the structrual design | If Bridge is very long,Engineer advises to erect a pier or support to divide the length into several shorter spans | |
bailey bridge Competitive Advantage:
Heavy loading capacity
Great stability
Long fatigue life
Light weight
Low cost
Easy and fast erection
|