Categories | Wall Panel Roll Forming Machine |
---|---|
Brand Name: | HC |
Model Number: | HC25 |
Certification: | ISO |
Place of Origin: | Botou Hebei China |
MOQ: | 1set |
Price: | 8000-15000USD |
Payment Terms: | 30% deposit by T/T in advance and 70% balance after inspection confirmation before shipment |
Supply Ability: | 20 sets/month |
Delivery Time: | 30days |
Packaging Details: | Main machine is nude,the computer control box is packed by carton box |
Suitable Material: | HRB60 or equivalent |
Material Thickness: | 0.2-0.6mm |
Roller: | High grade 45# steel |
Company Info. |
Cangzhou Huachen Roll Forming Machinery Co., Ltd. |
Verified Supplier |
View Contact Details |
Product List |
1.Specification:
No. | Item | Description |
1 | Raw material Standard | 1000mm |
2 | Working Speed | 1-3m/min (not including cutting time) |
3 | Roller Stations | 13 stations |
4 | Material of Roller | 45# steel quenching process and chrome coated |
5 | Material of Main Shaft | 45 steel forged, |
6 | Material of Shaft | 70 mm forged 45#steel, quenching process |
7 | Main Motor Power | 4KW |
8 | Electrical Hydraulic Station Power | 4KW |
9 | Hydraulic Station Pressure | 12.0 Mpa |
10 | Electrical Control System | PLC Panasonic Japan |
11 | Dimension (L*W*H) | 6500mm*1250mm*1300mm |
12 | Material of Cutter | Cr12 Mov HRC 58-62 |
13 | Driving Mode | single chain 1 inch |
14 | Material Thickness | 0.25-0.8mm |
15 | Cutting accuracy | ±2mm |
16 | Power Supply | 380V, 60HZ, 3 PHASES |
2.Supply range:
No | Item | Qty | Remark |
1 | 5 ton manual decoiler | 1 | |
2 | roll forming machine | 1 | |
3 | Hydraulic station | 1 | |
4 | Electric cabinet | 1 | |
5 | 3m receiveing table | 2 | |
6 | Document | 2 | Operation manual |
A:We have professional technicians for loading
Guaranteed the goods load into container without any damage.
B:Transportation : Machines need one 40 feet container to hold
7.Guarantee:
A: Guaranteed against malfunctions due to manufacturing defects for 1.0 year after date of purchase. Space parts will be made free of charge,but freight cost should be paid by buyer.
B: Space parts will not be performed even during the guarantee period in the follow circumstances
- Damage occurs due to a natural disaster
- Malfunction occurs due to user error
- Malfunction occurs due to modifications
- Malfunction occurs due to further movement or shipment after installation
8.Commissioning:
1 technician for 7 working days from seller to buyer’s side for the instruction of installation and commissioning as well training. An English-Chinese interpreter will be send by seller in case of the buyer asks. All the expenses of them including local transportation, food, laundry and accommodation in buyer’s country and visa,international tickets will be on the buyer side. The hotel shall be equivalent or better than the level of a Chinese 3 star hotel. The buyer shall provide each person USD 100 per day as pocket money.
9.Payment terms
- 30% by TT in advance
- 70% is paid before the shipment by TT
10.Delivery time: 30 days after the down payment is received