Sign In | Join Free | My insurersguide.com
insurersguide.com
Products
Search by Category
Home > Other Electronic Measuring Instruments >

Loadometer maintenance Loadometer maintenance

Loadometer maintenance Loadometer maintenance
Country/Region china
Company Top Weighing Equipment Co.,Ltd.
Categories External Hard Disk Cases
Telephone 0755-27080778 27096774 27094676, 0755-27092453
ICP License Issued by the Chinese Ministry
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
  • Submit Buying Request
    • Product Details
    • Company Profile

    Loadometer maintenance Loadometer maintenance

    Weighing bridge maintenance maintenance 

    1. A pound Taiwan maintains
    (1) in the pound Taiwan all around gap not to the card have the gravel, foreign matter and so on coal briquette.
    (2) inspects the spacing gap frequently to be whether reasonable, the spacing bolt and the scale body should not collide contacts.
    (3) the bridge piece carries on a maintenance every half year, the supporting forehead spreads the butter.
    (4) forbids on a pound stage to carry on the arc welding work, if must carry on the arc welding work in a pound Taiwan. Please note the following several points: (shut-off signal electric cable and weighing display control switch is connection; The arc welding grounding must establish, in is welded nearby the spot, and reliable contact on scale body; Cuts may not use the sensor to become an arc welding return route is part)

    2. The weighing display control switch maintains
    (1) to inspect various wiring frequently whether to become less crowded, breaks off, meets the grounding to be whether sturdy.
    (2) weighing the display control switch not to use (for example above for a long time one month), should carry on the circular telegram inspection according to the environmental condition, in order to avoid being affected with damp or other bad gas pickling influence reliability.
    (3) weighing the display control switch to avoid approaching the heat source, the vibration source.
    (4) uses in the environment not to have the flammable explosive gas or the dust.
    (5) do not meet the perceptual load on the weighing display control switch is identical phase line, like doorbell and so on.
    (6) weighing the display control switch not to use for a long time, the replacement fuse, moves situations and so on position or dusting, by all means must dump.
    (7) weighing the display control switch like breaks down when should the rapid power failure, then the notice specialized department and the personnel carry on the inspection to reorganize, the user do not disassemble the engine case at will, do not replace the internals at will.
    (8) a department pound personnel and the measuring appliance servicemen must through train specially can be engaged in the operation and the service.  
    3. Replacement sensor
    (1) turns on the sensor (damage) place above the lap, jacks the weighing platform with the hoisting jack, takes down the sensor grounding.
    (2) opens the connecting box, will damage sensor electric cable line and connecting box extrication. Extracts the electric cable line in the sensor end. Attention: When drawing, the enclosed lead wire passes through the scale body, so when can replace the new sensor, then the electric cable line traversing scale body enters the connecting box.
    (3) refers to the above second method, enters the connecting box the sensor electric cable line traversing scale body.
    (4) fixes according to the wiring diagram electric cable line various cores on the connecting box correspondence wiring column.
    (5) loosens the hoisting jack, sets level the weighing platform, covers the lap. after
    (6) replaces the sensor, must to the automobile balancing weight new hypothesis and the adjustment. after
    (7) the sensor installs, its unnecessary electric cable line should grip bundles the laying aside, do not lay aside directly in the foundation ground.
    (8) to guarantee that sensor is uniformity and the interchangeability, the sensor electric cable line do not interrupt at will.
    (9) installs and in the disassemblage process, do not appear scratches, the clash sensor phenomenon, and must protect the good electric cable line.

    4. The computer maintains
     (1) to guarantee that the computer earth system is good.
    (2) refuses the frequent switch, to move at will with the disassemblage computer.
     (3) the computer must be far away from the water source, the strong electromagnetism to gather together dry.
    (4) refuses to use the external floppy disk at will, prevents the infection virus.
     (5) refuses with the hard object to rap the keyboard, like screwdriver.
    (6) the engine room planted agent maintains clea
    Quality Loadometer maintenance Loadometer maintenance wholesale
    Send your message to this supplier
     
    From:
    To: Top Weighing Equipment Co.,Ltd.
    Subject:
    Message:
    Characters Remaining: (0/3000)
     
    Inquiry Cart 0